GO0D MAN: aGent Oriented Zero Defect Multi-stage mANufacturing

CORDIS

Grant Agreement Number

723764

Type

International Project

Status

Past project

Start date

1 October 2016

End date

30 September 2019

GO0D MAN: aGent Oriented Zero Defect Multi-stage mANufacturing

Area

Industry 4.0

Description

The main idea of GO0D MAN project is to integrate and combine process and quality control for a multi –stage manufacturing production into a distributed system architecture built on agent-based Cyber-Physical Systems (CPS) and smart inspection tools designed to support Zero-Defect Manufacturing (ZDM) strategies. Data analytics tools provide a mean for knowledge build-up, system control and ZDM management. Real time and early identification of deviations and trends, performed at local level, allow to prevent the generation of defects at single stage and their propagation to down-stream processes, enabling the global system to be predictive (early detection of process faults) and proactive (self-adaptation to different conditions).
The GO0D MAN project is based on the results of previous successful EU projects and integrates them to realize and deploy a Zero Defect Manufacturing framework for multi-stage production lines, in collaboration with industry partners, a system integrator, two technology providers and three end users. The use cases are representative of key European industrial sectors and have different types of multi-stage production systems: the first use case concerns highly automated serial mass production of automotive components, the second use case is about batch production of high precision mechanical components for automotive electro valves, the third use case produces professional customized products such as ovens for restaurants. Successful completion of this project will provide a replicable system architecture for ZDM. The results will be broadly applicable in a variety of industries to improve the overall quality and productivity of production systems.

Partners

AEA (IT), IPB (PT), UNINOVA (PT), UPM (IT), BOC (AT), NISSATECH (SR), VWAE (PT), ZANNINI (PL), ELECTROLUX (IT)

Global Budget

€ 5 027 625

Project Website

Link for project flyer